1. Bedford Project: Part 1
Aired: Oct 6, 2011 Work begins on a 300-year-old farmstead.
2. Bedford Project: Part 2
Aired: Oct 13, 2011 The crew transplantis shrubs and plants to a safe place until the job is comp...
3. Bedford Project: Part 3
Aired: Oct 20, 2011 The crew removes old clapboards and opens up a hole in the old fieldstone fou...
4. Bedford Project: Part 4
Aired: Oct 27, 2011 Framing up the new roof that will overlay the existing roof; repairing the ex...
5. Bedford Project: Part 5
Aired: Nov 3, 2011 Work begins on clearing the backyard. The crew assembles and raises the gabl...
6. Bedford Project: Part 6
Aired: Nov 10, 2011 The family room addition is framed up and sheathed. The crew installs new po...
7. Bedford Project: Part 7
Aired: Nov 17, 2011 The crew tops off cellulose insulation in walls, builds raised beds out of fi...
8. Bedford Project: Part 8
Aired: Nov 24, 2011 General contractor Tom Silva replaces a rotted post. Window restoration speci...
9. Bedford Project: Part 9
Aired: Dec 1, 2011 General contractor Tom Silva installs new red cedar clapboards. Plumbing and ...
10. Bedford Project: Part 10
Aired: Dec 8, 2011 Tom and Norm rebuild the front door surround to eliminate rot. Roger oversees...
11. Bedford Project: Part 11
Aired: Dec 15, 2011 Roger Installs a 3,000-pound slab of reclaimed granite for the front step. Th...
12. Bedford Project: Part 12
Aired: Dec 22, 2011 The crew installs decorative timbers in the new family room along with an A/C...
13. Bedford Project: Part 13
Aired: Dec 29, 2011 Roger uses old-style bricks for a winding entry path. The crew works to fit ...
14. Bedford Project: Part 14
Aired: Jan 5, 2012 The crew restores the panel front door with flexible epoxy and new paint. The...
15. Bedford Project: Part 15
Aired: Jan 12, 2012 The crew finishes the driveway and installs a new LED strip light at the old ...
16. Bedford Project: Part 16
Aired: Jan 19, 2012 Roger installs new and old plant material. The crew puts the finishing touche...
17. Barrington Project: Part 1
Aired: Jan 26, 2012 Crews restore an oceanside home in Barrington, Rhode Island.
18. Barrington Project: Part 2
Aired: Feb 2, 2012 The crew prepares the house for Hurricane Irene and begins framing the second...
19. Barrington Project: Part 3
Aired: Feb 9, 2012 Installing windows using a custom copper pan for flashing; installing archite...
20. Barrington Project: Part 4
Aired: Feb 16, 2012 Exterior shingles; hydronic system integrated with a solar hot water system o...
21. Barrington Project: Part 5
Aired: Feb 23, 2012 Installing a custom copper gutter and scupper as well as coastal tolerant and...
22. Barrington Project: Part 6
Aired: Mar 1, 2012 The Brazilian hardwood garapa is installed on the new deck; red cedar shingle...
23. Barrington Project: Part 7
Aired: Mar 8, 2012 Replacing cracked asphalt with new concrete pavers in the driveway; using che...
24. Barrington Project: Part 8
Aired: Mar 15, 2012 Retractable awning; Saratoga soapstone; light fixtures; electric floor warmin...
25. Barrington Project: Part 9
Aired: Mar 22, 2012 Glass tile; installing a garage storage system; cable railing system; install...
26. Barrington Project: Part 10
Aired: Mar 29, 2012 Advanced programmable thermostat; solar shades; dividing the master closet in...